How Do You Handle Power Outages During a Sterilization Cycle?

A power outage during a sterilization cycle interrupts the cycle, and the load must be treated as not sterile. The correct response is to hold and quarantine the load, record the abort, and reprocess it on a fresh cycle once power is restored. A cycle that stopped part way through has not completed its hold time, so nothing about it can be treated as finished.

What Happens to a Cycle When Power Fails?

Most benchtop sterilizers stop when power is lost, and some may not resume the cycle even when power returns. The chamber and the load therefore remain at whatever state the interruption left them, which is not a completed sterilization cycle. The controller may log an error, and the door may remain locked until the pressure equalises.

Some units have a memory function that resumes after a power event, but even then the correct action is to treat the load as suspect unless the manufacturer's guidance and the clinic's policy allow otherwise. Resuming a cycle is not the same as having completed one without interruption.

What Should You Do With the Load?

Hold it, quarantine it, and do not release any instrument from it. Record the interruption in the log with the time and the affected cycle, then reprocess the load on a fresh cycle once the unit is running normally. If the load contained implant or critical items, follow the clinic's policy on quarantine and reprocessing.

The reason to quarantine first and reprocess second is that the interruption may not be obvious later. If the load were returned to the shelf and the abort were logged loosely, a future reviewer could not tell whether the instruments were sterile. Keeping the load aside makes the safe action the default.

CliniEco Medical Class 4 dual-indicator sterilization pouches, 200-pack, used for packaging and integrity control in a sterile processing suite

How Do You Record the Interruption?

Write the abort in the same log as the routine entries, with the date, the unit, the cycle type, the time power was lost, and what happened to the load. Then record the reprocessed load and its result beside it, so the record shows the whole episode. This is the convention used for any aborted cycle.

If the unit logs its own error, note that reference too. A recurring pattern of power-related aborts points to a supply problem or a unit that should be on a protected circuit, and that pattern only becomes visible if each event is written down. This follows the same convention used for any aborted cycle, and it is the reason the abort and its reprocess sit together rather than in separate books.

How Do You Reduce the Risk in Future?

Plan for the outage rather than hoping it will not happen. Keep a small stock of spare consumables so a reprocess does not stall on supplies, and know in advance which loads can wait and which cannot. For a clinic with critical instrument needs, a planned backup arrangement for emergency sterilization is worth having before it is needed.

The supplies for a fast recovery are ordinary: a reserve of biological indicators to re-test the reprocessed load and a stock of sterilization pouches to repackage anything whose packaging was compromised. The sterilization monitoring collection groups these so an outage recovery is a matter of pulling from stock rather than ordering.

Pair of blue nitrile examination gloves laid out flat for a care or housekeeping task
Event Action
Power lost mid-cycle Treat the load as not sterile
Load handling Hold and quarantine
Log entry Date, unit, cycle, time lost, load handling
Restoration Reprocess on a fresh cycle and record the result
Repeat events Review the power supply and consider a protected circuit

Related reading

Sterilization compliance hub; how one clinic managed a 72-hour outage; autoclave downtime costs for unplanned service visits.

Download the printable sterilization log sheet and use the autoclave log generator. Ask a Sterilization Compliance Specialist at the compliance desk. Ordering for a clinic, lab or care home? Wholesale and multi-site ordering and the B2B wholesale collection cover case pricing and account setup. Clinics can also 24-hour biological indicator 25-pack. Reselling? become a distributor.

Frequently Asked Questions

What do you do if the power fails during a sterilization cycle?

Treat the load as not sterile: hold and quarantine it, record the interruption, and reprocess it on a fresh cycle once power is restored, keeping the abort and the reprocess in the same log.

Does a sterilizer cycle resume after a power cut?

Some units may resume, but the load should still be treated as suspect unless the manufacturer's guidance and the clinic's policy allow otherwise, because a resumed cycle is not a completed one.

How should a power-related abort be recorded?

In the routine log, with the date, unit, cycle type, time power was lost and the load handling, followed by the reprocessed load and its result so the whole episode is traceable.

CliniEco Medical is a licensed medical device establishment (MDEL #35334).

Already working with clinics? Become a regional representative.